Air load planning
Impact
Approximately $700 million saved annually for UPS Airlines
I led the research, design, and production deployment of an air cargo planning system that combines demand forecasting with mathematical optimization. I used Python and Gurobi to take the model from development into live operation.
Optimization with Uncertainty · Live production · ML Prediction Methods · Gurobi · Non-linear mixed-integer programming
Sort facility digital twin & optimization
Impact
A framework for large-scale throughput optimization
I direct research and development of a digital twin for large-scale sort facilities, guiding engineers from research through product development. I designed a sequential optimization framework that breaks large planning problems into coordinated stages using Gurobi and a fix-and-optimize algorithm.
Research & development leadership · Simulation · Mathematical optimization
Contingency planning during disruption
Impact
75% reduction in contractor overhead
I designed, validated, and deployed a contingency planning tool within two weeks during a union strike. The model supported real-time resource allocation as operating conditions changed.
Production deployment · Two-week delivery window
Network scheduling optimization
Impact
12–18% reduction in idle time
I designed and deployed a scheduling heuristic that improves resource use while maintaining compliance with complex network rules and operational constraints.
Production scheduling system
Fleet & asset sizing
Impact
10–15% reduction in asset requirements across targeted routes
I developed a fleet-sizing heuristic that refines an optimization model’s output. I integrated it into live planning systems to determine the assets needed across targeted logistics routes.
Production deployment · Targeted logistics routes
Airline staff optimization
Impact
A prototype for solving complex airline staffing schedules
I collaborated on a Gurobi-based mixed-integer solver, translating interlocking staffing rules into modular constraints for a large planning problem.
Collaborative prototype · Mixed-integer programming · Gurobi
Independent solver validation
Impact
An independent baseline for evaluating solver performance and ROI
I built a simulation and optimization engine to assess the statistical efficacy and performance gains of production planning solvers, using simulation and Variable Neighborhood Search.
Research & prototype · Simulation · Solver evaluation
Optimization engine migration
Impact
A modernized planning system for peak-demand, real-time operation
I led the migration of a core planning engine from a C++ / CPLEX implementation to Gurobi, refactoring legacy solver logic to improve speed and reliability.
System modernization · C++ · CPLEX → Gurobi
Hardware rollout planning
Impact
Scenario-based decision support for future hardware requirements
I built a tool that lets executives run simulations and compare scenarios to determine which hardware assets would be needed for future rollouts.
Decision support · Scenario analysis · Asset planning